DatasheetQ Logo
Electronic component search and free download site. Transistors,MosFET ,Diode,Integrated circuits

AD7450ARMZ-REEL7 データシートの表示(PDF) - Analog Devices

部品番号
コンポーネント説明
メーカー
AD7450ARMZ-REEL7 Datasheet PDF : 22 Pages
First Prev 11 12 13 14 15 16 17 18 19 20 Next Last
AD7450
CS
12
10
SCLK
SDATA
THREE-STATE
Figure 22. Entering Power-Down Mode
Once CS has been brought high in this window of SCLKs, the
part will enter power-down, the conversion that was initiated by
the falling edge of CS will be terminated, and SDATA will go
back into three-state. The time from the rising edge of CS to
SDATA three-state enabled will never be greater than t8 (see
Timing Specifications). If CS is brought high before the second
SCLK falling edge, the part will remain in normal mode and will
not power down. This will avoid accidental power-down due to
glitches on the CS line.
To exit this mode of operation and power the AD7450 up again,
a dummy conversion is performed. On the falling edge of CS, the
device will begin to power up and continue to power up as long
as CS is held low until after the falling edge of the 10th SCLK. The
device will be fully powered up after 1 µs has elapsed and, as
shown in Figure 23, valid data will result from the next conversion.
If CS is brought high before the 10th falling edge of SCLK, the
AD7450 will again go back into power-down. This avoids
accidental power-up due to glitches on the CS line or an
inadvertent burst of eight SCLK cycles while CS is low. So although
the device may begin to power up on the falling edge of CS, it will
again power down on the rising edge of CS as long as it occurs
before the 10th SCLK falling edge.
Power-Up Time
The power-up time of the AD7450 is typically 1 µs, which means
that with any frequency of SCLK up to 18 MHz, one dummy cycle
will always be sufficient to allow the device to power up. Once
the dummy cycle is complete, the ADC will be fully powered up
and the input signal will be acquired properly. The quiet time,
tQUIET, must still be allowed from the point at which the bus
goes back into three-state after the dummy conversion to the
next falling edge of CS.
When running at the maximum throughput rate of 1 MSPS,
the AD7450 will power up and acquire a signal within ± 0.5 LSB
in one dummy cycle, i.e., 1 µs. When powering up from the
power-down mode with a dummy cycle, as in Figure 23, the
track-and-hold, which was in hold mode while the part was
powered down, returns to track mode after the first SCLK
edge the part receives after the falling edge of CS. This is shown
as Point A in Figure 23.
Although at any SCLK frequency one dummy cycle is sufficient
to power the device up and acquire VIN, it does not necessarily
mean that a full dummy cycle of 16 SCLKs must always elapse
to power up the device and acquire VIN fully; 1 µs will be
sufficient to power the device up and acquire the input signal.
For example, if a 5 MHz SCLK frequency was applied to the ADC,
the cycle time would be 3.2 µs (i.e., 1/(5 MHz) ϫ 16). In one
dummy cycle, 3.2 µs, the part would be powered up and VIN
acquired fully. However, after 1 µs with a 5 MHz SCLK, only
5 SCLK cycles would have elapsed. At this stage, the ADC would
be fully powered up and the signal acquired. So, in this case, the
CS can be brought high after the 10th SCLK falling edge and
brought low again after a time, tQUIET, to initiate the conversion.
When power supplies are first applied to the AD7450, the ADC
may either power up in the power-down mode or normal mode.
Because of this, it is best to allow a dummy cycle to elapse to
ensure the part is fully powered up before attempting a valid
conversion. Likewise, if the user wishes the part to power up in
power-down mode, then the dummy cycle may be used to ensure
the device is in power-down by executing a cycle such as that
shown in Figure 22.
Once supplies are applied to the AD7450, the power-up time is
the same as that when powering up from the power-down mode.
It takes approximately 1 µs to power up fully if the part powers
up in normal mode. It is not necessary to wait 1 µs before
executing a dummy cycle to ensure the desired mode of operation.
Instead, the dummy cycle can occur directly after power is
supplied to the ADC. If the first valid conversion is then performed
directly after the dummy conversion, care must be taken to ensure
that adequate acquisition time has been allowed.
As mentioned earlier, when powering up from the power-down
mode, the part will return to track upon the first SCLK edge
applied after the falling edge of CS. However, when the ADC
powers up initially after supplies are applied, the track-and-hold
will already be in track. This means if (assuming one has the
facility to monitor the ADC supply current) the ADC powers
up in the desired mode of operation, and thus a dummy cycle is
not required to change the mode, then a dummy cycle is not
required to place the track-and-hold into track.
tPOWER-UP
THE PART BEGINS
CS
TO POWER UP
THE PART IS FULLY POWERED
UP WITH V IN FULLY ACQUIRED
SCLK
1
10
16
1
10
16
A
SDATA
INVALID DATA
Figure 23. Exiting Power-Down Mode
VALID DATA
Rev. A
–17–

Share Link: 

datasheetq.com  [ Privacy Policy ]Request Datasheet ] [ Contact Us ]